 Project Progression

   
         
  Excavation — takes place after perc tests are complete. Perc tests determine what type of septic system your site requires and where it must be located. Once this is done you can locate where the house will sit.   excavation  
         
  Foundation — This particular home was built on a “slab at grade”. With in-floor hydronic radiant heat.   foundation  
         
  Frame-up — In a couple days your home begins to take shape.   frame up  
         
  Trusses — Set in one morning, half the roof sheathing in place by that same afternoon.   trusses  
         
  Weatherized — Roof sheathing is in place and protected from the weather. Now it’s time to finish the interior framing in order for subcontractors to come and rough-in their portions of the project.   weatherized  
         
  Roof Covering — is installed as soon as possible. Homes with full basements would have the concrete floor in the basement poured at this point.   roof covering  
         
  Power — trenched in to your home by the power company.   power  
         
  Windows & Doors — Things are really moving along nicely from Frame-up to Windows 15 days have passed.   windows & doors  
         
  Insulation — After inspection of plumbing, electrical, and framing the insulation can be installed. Shown here is the “bib system”. Loose fiberglass is blown into each wall cavity.   insulation  
         
  Insulation — This system provides for a better insulated exterior wall. Keeping your home warmer & cooler easier. Walls insulated with this system have been rated at an R-23. The ceiling will also have blown insulation installed, R-60.   insulation  
         
  Air Sealing — Careful attention is given to all areas of your home. Caulk and insulating foam are used to seal up gaps and holes that have been made during the rough-in of electrical, plumbing and heating equipment.   air sealing  
         
  Drywall — After the insulation inspection is complete everything is ready to be covered up. Bring in the drywall.   drywall  
         
  Well — It may take a day or a week, when their done you’ll have water for your home.   well  
         
  Drywall — Tape and mud are in place.   drywall  
         
  Siding & Soffit — Moving to the exterior, now the siding is installed. Many options of type, style, and color. The combinations are endless.   siding  
         
  Drywall — Finished and Painted. Top coat of paint can be sprayed on at this point or you can have each room painted the color you prefer. This is the point where, research has shown, most homeowners begin to panic. Possibly loosing faith in their contractor. THIS IS NORMAL. Things seem to slow to a standstill as the drywall is being finished. However, take heart, we get rolling again as soon as the paint dries.   drywall  
         
  Lights — Electricians turn on the lights and energize the outlets.   lighting  
         
  Flooring — Tile, hardwood, or laminate flooring are next to be installed.   flooring  
         
  Garage Door — Your home is closed up and ready for interior trim.   garage  
         
  Cabinetry — Once the flooring is installed thecabinets & countertops go in. Then the plumbers can finish their work.   cabinetry  
         
  Finish Trim — Doors are hung, base trim is installed. Schedule your move in date we are almost ready.   finish trim  
         
  Home Performance Test — We’ve built you a superior home and we’ll prove it! This test is performed by a professional Energy Consultant. Your home is being tested for proper ventilation and combustion safety. As well as air leakage.   home performance  
         
  More Testing — This home has passed. Satisfying ENERGY STAR® program standards and exceeding nationally accepted air-tightness guidelines by 59% in terms of eliminating unwanted air leakage into and out of the home. This home’s index places it in the1st percentile of all homes built in Wisconsin in terms of its’ energy efficiency.   testing  
         
  Carpet — Carpets in.   carpet  
         
  Final Clean-up — Sweep, mop, wash & remove stickers from windows.   clean up  
         
  COMPLETE — Your home is now ready for you to move in. WELCOME HOME!   complete